Tuesday, July 1, 2008

Security Engineering : Electronic Security System

File : pdf, 2.27 MB, 150 pages

TOC

CHAPT 1 INTRODUCTION
1-1 PURPOSE
1-2 SCOPE
1-3 REFERENCES
1-4 GLOSSARY
1-5 SECURITY ENGINEERING UFC SERIES
1-6 ORGANIZATION OF THIS UFC

CHAPT 2 ELECTRONIC SECURITY SYSTEM OVERVIEW
2-1 OVERVIEW
2-2 DETECT, DELAY, AND RESPOND
2-3 ESTABLISH REQUIREMENTS
2-4 SYSTEM COMPLEXITY
2-5 MONITORING METHODS

CHAPT 3 ACCESS CONTROL SYSTEMS
3-1 OVERVIEW
3-2 ACS ENTRY-AUTHORIZATION IDENTIFIERS
3-3 OTHER ACS IMPLEMENTATION CONSIDERATIONS
3-4 ACS EQUIPMENT
3-5 ACS DESIGN GUIDANCE

CHAPT 4 CLOSED CIRCUIT TELEVISION SYSTEMS
4-1 OVERVIEW
4-2 DIGITAL VIDEO RECORDER (DVR)
4-3 SYSTEM DISPLAYS
4-4 VIDEO MATRIX SWITCHERS
4-5 KEYBOARDS
4-6 CAMERAS
4-7 INTERNET PROTOCOL (IP) ADDRESSABLE CAMERAS
4-8 RECORDING
4-9 ILLUMINATION
4-10 VIEWING IN LOW-LIGHT CONDITIONS
4-11 POWER
4-12 CAMERA FIELDS-OF-VIEW
4-13 RESOLUTION
4-14 FRAMES PER SECOND (FPS)
4-15 BANDWIDTH
4-16 WHITE BALANCE
4-17 CCTV CAMERA EMPLOYMENT FOR INTRUSION DETECTION
4-18 CCTV EQUIPMENT CONSIDERATIONS
4-19 CCTV SYSTEMS DESIGN GUIDANCE

CHAPT 5 INTRUSION DETECTION SYSTEM
5-1 OVERVIEW
5-2 CENTRAL PROCESSING UNIT (CPU)
5-3 INTERIOR SENSORS
5-4 EXTERIOR SENSORS
5-5 SYSTEM CONFIGURATION
5-6 IDS DESIGN GUIDANCE
5-7 SUMMARY

CHAPT 6 DATA TRANSMISSION MEDIA (DTM)
6-1 INTRODUCTION
6-2 BANDWIDTH ANALYSIS
6-3 SECURE COMMUNICATIONS
6-4 NETWORK TOPOGRAPHY
6-5 COMMUNICATION REDUNDANCY
6-6 TRANSMISSION MODES/PROTOCOLS
6-7 TRANSMISSION MEDIA
6-8 TECHNOLOGY COMPARISION
6-9 ENCRYPTION

CHAPT 7 DISPATCH CENTER
7-1 INTRODUCTION
7-2 SPACE
7-3 LIGHTING
7-4 CONSOLES
7-5 MONITORS
7-6 GROUNDING/POWER CONDITIONING
7-7 HVAC
7-8 SUPPORT ROOMS

CHAPT 8 ESS SUBSYSTEM INTEGRATION
8-1 OVERVIEW
8-2 COMMUNICATION FROM THE IDS TO THE ACS
8-3 COMMUNICATION FROM THE IDS TO THE CCTV SYSTEM
8-4 COMMUNICATION FROM THE CCTV SYSTEM TO THE ACS
8-5 COMMUNICATION FROM THE ACS TO THE DISPATCH CENTER
8-6 COMMUNICATION FROM THE DISPATCH CENTER TO THE ACS
8-7 BANDWIDTH ANALYSIS

CHAPT 9 GENERAL REQUIREMENTS AND CROSS-DISCIPLINE COORDINATION
9-1 GENERAL REQUIREMENTS
9-2 GENERAL COORDINATION
9-3 CIVIL COORDINATION
9-4 ARCHITECTURAL COORDINATION
9-5 LIFE SAFETY CODE CONSIDERATIONS
9-6 ELECTRICAL COORDINATION
9-7 MATERIAL ENTRY CONTROL

CHAPT 10 MODEL DESIGN APPROACH
10-1 INTRODUCTION
10-2 PROJECT PLANNING
10-3 INITIAL DRAWING PREPARATION
10-4 BASIS OF DESIGN
10-5 SCHEMATIC DESIGN PHASE
10-6 DESIGN DEVELOPMENT PHASE
10-7 BIDDING
download : pdf1

No comments: